Data centres in the desert: a digital boom with a power and water bill
An investigation into the region’s race to host cloud and AI computing
Countries across the region are racing to build giant data centres for AI, but their huge appetite for energy and water raises hard questions about sustainability.
In the heart of the desert, windowless grey buildings rise behind high fences and tight surveillance. These are the data centres the region is racing to build as cloud computing and artificial intelligence become pillars of the digital economy.
Consultancy estimates suggest planned data centre capacity in the Middle East and North Africa could triple within five years, with billions of dollars flowing in from local and international operators.
The energy bill
But the boom comes at a cost. A single mid-sized AI data centre can use as much electricity as a small town, and the region’s high temperatures drive cooling costs sharply higher.
Documents reviewed by Al Youm News show that some announced projects did not include detailed studies of the water sources to be used for cooling, despite being located in areas already facing water scarcity.
“The question is not whether we build data centres, but how we build them without draining the resources of future generations,” said an energy engineering expert.
Possible solutions
Specialists propose linking new data centres to dedicated solar and wind plants, using closed-loop air or liquid cooling, and requiring every facility to disclose its energy and water consumption.
Comments 0
Share your view — respectful debate makes the difference
Sign in to join the conversation.
Be the first to start the conversation on this story.
Related stories
Source: https://alyoumeg.com/en/news/technology/data-centres-in-the-desert-a-digital-boom-with-a-power-and-water-bill